Path or walkthrough areas the crew needs to be aware of — gate width, side-yard access, stairs, slope, anything that affects how materials get to the install zone.
Front yard, back yard, and access path — the three the crew always needs first. Add gate width, hardscape, and drainage shots if relevant.
OneNote sketch exported as PDF. Shows measurements and zones. Multi-upload supported for revisions — the latest is what the crew sees.
Document any pre-existing damage in the work area (concrete cracks, fence issues, sprinklers, irrigation, etc.). If there is no visible damage, check the bypass box below to confirm.
60-second walk-around for slope, drainage, or customer-specific requests. Helps the crew plan, but not required to dispatch.
Files are saved as you upload them. Click below any time to rebuild the installer packet with the latest set.